Sunday, July 24, 2011

Greenhouse Foundation

I finally made some progress on the greenhouse. The first two rows of tires are finished and so is the drain. The drain is set on the inside perimeter, just below the level of the first row of tires, and runs out the south end (to the right in the 2nd photo). Pounding tires is slow work, and fatigue is definitely a factor in how much I can finish in a day. Especially this weekend with 100+ degree heat to contend with.

Footings with first row of tires

Greenhouse Foundation